Search blog.co.uk

Archives for: September 2005

Narrowboat Balmaha – making progress inside and out

by jakepithf @ 2005-09-24 - 11:31:00

It’s been three weeks since our last visit to the boatyard. Much has changed since we discussed the division of space inside the 43’-6” steel tube (237.836 km if you’re metric). Bulkheads have gone up and cupboard frames have sprouted; fresh water and heating pipes fit snugly behind the fixed furniture. The main impression is that living space has shrunk and where we were looking at a long thin bungalow it’s now going to be a stretched caravan.
Fortunately we will have a huge garden, flowers and trees in abundance and when the weeds grow too big we can just move on.

Here’s some of the changes.
Up at the pointy end we have the “cratch”. It awaits the cratch cover specialist to measure up.

cratch frame

Coach lines don’t look so lost now the portholes are in.
coach lines

Electrical cupboard.

Inverter

This is one of the two “disposal” points. I shall spend a lot of time here.
Cassette Loo

This is the creative part of the boat. Real hot and cold sandwiches made here. Smoked salmon, caviar, or my favourite – dripping sandwiches.
Cooker

Here’s where we part with our clothes, eventually. I shan’t give up my socks so easily, they’re good for at least two weeks, aren’t they?
Washer-drier

This is where I’ll spend most of my time, it’s the bed or rather the bed-base showing rails for the bottom 1/3rd which extends across the full width of the boat. Under here goes a stainless steel tank.

Bed

And yes, we have an engine and it’s kept covered.

Engine

Lastly congratulations to Mike and Pat who beat us to the water with “Hyperion”
Looking forward to sharing another bottle of champagne and, of course, using your loo !!

Narrowboat Balmaha – still at the builders (month 3)

by jakepithf @ 2005-09-04 - 17:15:05

So what’s happened with the boat build these last few weeks?

Portholes cut, ceiling T&G mostly complete and varnished, room dividers and main cupboard templates in place to get a feel for size and position.

ceiling1
----------------------------------

Gold coach lines added to green gloss top coat.
Decal1
----------------------------------
I don’t see how narrowboats can sink when they’ve got insulation this thick?
Insulation1
----------------------------------
Bow colours awaiting diamonds or scrollwork and cratch under construction.
Bows1
----------------------------------
The top of our first 40 locks after launch (before lunch) but where is it?
Locks1
----------------------------------
This will be our first tunnel, needs a bit of decoration before we go through. Looks like BW are on to it.
Tunnel1
----------------------------------

Footer

The content of this website belongs to a private person, blog.co.uk is not responsible for the content of this website.